![background image](http://html.mh-extra.com/html/h-p-cosmos/arsalis-gaitway-3d/arsalis-gaitway-3d_service-manual_574521101.webp)
gaitway-3D Service manual
Ref.:TM-MAN-0005-ARS
Iss.: A
Rev.: 9
Date: 07/12/2020
Page : 97
Test Step
Measurements/Test Results
Seq.
No.
Description
Required/No
minal (incl.
tolerance)
Measured/
Calculated
Remarks/Calculations
Pass/
No
pass
41.
Measure the impedance of the load cell
cable
shielding
(on
cable
connector
backshell) to the treadmill PE.
R1 < 1ohm
R2 < 1ohm
R3 < 1ohm
R4 < 1ohm
R1=
R2=
R3=
R4=
42.
Connect the 4 load cell cables to the
amplifier.
43.
Adjust the length of the load cell cables on
the side of the replaced load cell.
Roll the cable excess into the cable trays on
the foot plates. Close the cable trays.
Tighten the tie wraps on the load cell cables.