5.1. gaitway-3D unpacking
The gaitway-3D is delivered on a palette as shown in Figure 10. The fixation belts
and plastic protection are removed. The parts are manipulated without shock to avoid
any damage to the load cells. The main parts are unpacked. The treadmill and other
main parts are transported on wheel boards to the installation location.
Figure 10: Shipment configuration on palette and treadmill transport.
5.2. Treadmill support assembly
The load-cells are mounted on the foot plates.
While the treadmill is supported by two wheel boards, the left and right support
assemblies are mounted to the treadmill.
5.3. gaitway-3D floor fixation
The holes for floor anchorages are marked and drilled according to the floor fixation
pattern shown on Figure 11. The floor anchorage parts are placed and the gaitway-
3D supports are bolted to the floor.