![background image](http://html.mh-extra.com/html/h-p-cosmos/arsalis-gaitway-3d/arsalis-gaitway-3d_service-manual_574521097.webp)
gaitway-3D Service manual
Ref.:TM-MAN-0005-ARS
Iss.: A
Rev.: 9
Date: 07/12/2020
Page : 93
Test Step
Measurements/Test Results
Seq.
No.
Description
Required/No
minal (incl.
tolerance)
Measured/
Calculated
Remarks/Calculations
Pass/
No
pass
29.
Screw the Load cell case on the base plates.
Use 4x screws, 4x new washers and 1x tie-
holder. Tie-holder is at the internal side (left
side of right support or the opposite).
Torque =
1.8Nm
4x ISO7380 M4x10,
4x DIN6798A M4,
2x Tie-mount
30.
Tighten the cable gland on the cable.