35.
Remove the Treadmill-spacer-back.
36.
Screw the treadmill to the floor.
For mechanical anchorages, torque screws
at 15Nm.
For chemical anchorages, torque screws at
8Nm.
Torque:
Mech. =
15 Nm
Chemic =
8 Nm
Torque:
26x DIN933-M10x30
26x DIN9021-M10
37.
Dismount both, left and right, handrail posts
from the treadmill beams, set screws and
washers aside, then lay the handrails
temporarily on the treadmill
Torque =
30Nm
8x DIN933-M10x25
8x DIN6798A-M8
38.
Remount the handrail supports to the foot
plates by screwing the 8 screws and using
new washers.
Ensure that the handrail support ribs do not
touch the treadmill beams and that the
handrail supports do not touch the treadmill
motor-cover.
Torque =
30Nm
8x DIN933-M10x25
8x DIN6798A-M8
39.
Screw the handrails to the handrail supports
using the screws and washers set aside at
step
Torque =
15Nm
40.
Route the cables of the new load cell as it
was for the removed load cell. If needed, the
path is described in section
Let the tie wraps loose.
Tie-wraps