Chapter 13 Communication
291
Ⅱ
Operation
At the mode, the user can receive the files from the CNC to the current project or send files in the
current project to the CNC.
12.1.3 Receiving files (CNC
→
PC)
Click the option [Receive files from CNC] in [Communication] and GSKComm can receive files
from the CNC after the current project is selected as follows:
After [Receive Files ] is clicked, a dialog box about receiving files from the CNC, the required files
from the CNC including part programs, tool compensation (TOFF. CMP), pitch compensation
(WOFF.WMP), parameters (PARAM.PAR).
Содержание GSK980TDc
Страница 17: ...I Programming ...
Страница 18: ...GSK980TDc Turning CNC System User Manual ...
Страница 190: ...GSK980TDc Turning CNC System User Manual 172 Ⅰ Programming ...
Страница 191: ...Ⅱ Operation Ⅱ Operation ...
Страница 192: ...GSK980TDc Turning CNC System User Manua Ⅱ Operation ...
Страница 217: ...Chapter 1 Operation Mode and Display Interface 197 Ⅱ Operation 2 Data parameter page 3 Common used parameter page ...
Страница 326: ...GSK980TDc Turning CNC System User Manual 306 Ⅱ Operation ...
Страница 327: ...Ⅲ Connection Ⅲ Connection ...
Страница 328: ...GSK980TDc Turning CNC System User Manual Ⅲ Connection ...
Страница 470: ...GSK980TDc Turning CNC System User Manual 448 Ⅲ Connection ...