GE Analytical Instruments ©2009
176 of 236
DLM 90488-01 Rev. A
6. Remove the new reagent container(s) from the packaging. Record the expiration date of
the acid and oxidizer and the volume of the oxidizer in the Notes column on the
Maintenance Worksheet
(see Table 18 on page 193); you also will need to enter these
dates into the Analyzer later.
7. For each reagent, follow these steps:
• Locate the supply line for the reagent you are replacing, indicated by the
Acid
or
Oxidizer
label on the tubing.
• Attach the appropriate PEEK nut to the reagent container and tighten finger-tight.
• Press the green button all the way in to open the valve on the reagent container. Refer
to the labeling on the container for proper positioning.
• Slide the container into the reagent enclosure, with the valve pointing down and
toward the front of the reagent enclosure. Be careful to move tubing and wires out of
the way while sliding the cartridges into the enclosure, so you do not inadvertently
crimp tubing or loosen cable connections.
8. Replace the reagent enclosure cover and tighten the set screw until it is finger-tight.
9. If you need to replace other consumables, follow the procedures listed in the appropriate
sections of this chapter. Otherwise, close and latch the Analyzer door.
10. Power the Analyzer on.
11. Enter the installation and expiration dates for the reagents by following the procedures in
“Setting the Installation or Expiration Date for New Consumables” on page 190 to ensure
that the Analyzer correctly tracks the life of the new reagents.
12. To reduce the possibility of bubbles, perform a flush of the reagent syringes before
resuming normal operation. Refer to “Flushing the Reagent Syringes” on page 191 for
details.
Replacing the UV Lamp
The intensity of the UV lamp, particularly the emission of short-wavelength radiation, decreases
over time. Replace the lamp after every six months of operation.
Содержание Sievers 900 Series
Страница 10: ...GE Analytical Instruments 2009 10 of 236 DLM 90488 01 Rev A ...
Страница 64: ...GE Analytical Instruments 2009 64 of 236 DLM 90488 01 Rev A Figure 3 Left Side Dimensions of the Analyzer ...
Страница 88: ...GE Analytical Instruments 2009 88 of 236 DLM 90488 01 Rev A ...
Страница 122: ...GE Analytical Instruments 2009 122 of 236 DLM 90488 01 Rev A ...
Страница 159: ...GE Analytical Instruments 2009 159 of 236 DLM 90488 01 Rev A ...
Страница 161: ...GE Analytical Instruments 2009 161 of 236 DLM 90488 01 Rev A ...
Страница 165: ...GE Analytical Instruments 2009 165 of 236 DLM 90488 01 Rev A ...
Страница 167: ...GE Analytical Instruments 2009 167 of 236 DLM 90488 01 Rev A ...
Страница 170: ...GE Analytical Instruments 2009 170 of 236 DLM 90488 01 Rev A ...
Страница 172: ...GE Analytical Instruments 2009 172 of 236 DLM 90488 01 Rev A Figure 30 Interior Overview of the Analyzer ...
Страница 194: ...GE Analytical Instruments 2009 194 of 236 DLM 90488 01 Rev A ...
Страница 217: ...GE Analytical Instruments 2009 217 of 236 DLM 90488 01 Rev A Figure 47 Draining the Measurement Module ...
Страница 218: ...GE Analytical Instruments 2009 218 of 236 DLM 90488 01 Rev A ...
Страница 235: ...Notes GE Analytical Instruments 2009 235 of 236 DLM 90488 01 Rev A 236 ...
Страница 236: ...Notes GE Analytical Instruments 2009 236 of 236 DLM 90488 01 Rev A 236 ...