63
Travel Calibration
Setup
Normally, control parameters need not be readjusted after auto tuning. If there is a
problem, see “Troubleshooting” on page 175. To carry out fine adjustments of the
zero-point and span settings, perform the travel calibration.
Travel Calibration
If the full stroke of the valve is too large for the maximum required flow rate, you can
change the span of the travel by carrying out a travel calibration:
1. Vary the value of FINAL_VALUE.value to move the stem and adjust the stem to the
desired point for the 100% position.
2. Write 3 to TRAVEL_CALIB_EXEC. This changes the span while leaving the zero
point unchanged.
TRAVEL_CALIB_EXEC:
❑
1 = off
❑
2 = 0%-point calibration (no change to span)
❑
3 = span calibration (no change to 0% point)
❑
4 = 50%- point calibration (no change to either span or 0% point)
NOTE
Only when the target mode's in both the AO and transducer
blocks are O/S, can FINAL_VALUE.value be written.
The result of the travel calibration is written to TRAVEL_CALIB_RESULT.
Check Valve Actions
After carrying out auto tuning, check step responses by changing the value of the
transducer block's final valve position setpoint, FINAL_VALUE.value. Also, check
whether the valve acts correctly over the 0-100% position range.
NOTE
Only when the target mode is in MODE_BLK parameters in
both the AO and transducer blocks are O/S, can
FINAL_VALUE.value be written.
It is not usually necessary to readjust the control parameters
after auto tuning. However, when using the Double Acting
Type, or if the expected response characteristics cannot be
obtained using auto tuning, either conduct manual tuning,
as in “Manual Tuning Guideline” on page 253 or refer to
“Troubleshooting AutoTuning” on page 181.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......