87
System Configuration
About Fieldbus
System Configuration
The following instruments are required for use with Fieldbus devices:
Power supply
Fieldbus requires a dedicated power supply. It is recommended
that current capacity be well over the total value of the maxi-
mum current consumed by all devices (including the host). Con-
ventional DC current cannot be used as is.
Terminator
Fieldbus requires two terminators. Refer to the supplier for
details of terminators that are attached to the host.
Field devices
Connect the field devices necessary for instrumentation.
FVP110 has passed the interoperability test conducted by The
Fieldbus Foundation. In order to properly start Fieldbus, use the
devices to satisfy the requirements of the above test.
Host
Used for accessing field devices. A dedicated host (such as
DCS) is used for an instrumentation line while dedicated com-
munication tools are used for experimental purposes.
Cable
Used for connecting devices. Refer to
Fieldbus Technical Infor-
mation
(TI 38K3A01-01E) for details of instrumentation cabling.
Provide a cable sufficiently long to connect all devices. For field
branch cabling, use terminal boards or a connection box, as
required. If the total length of the cable is in a range of 2 to 3
meters for laboratory or other experimental use, use a twisted
pair wire with a cross section of 0.9 mm
2
or more (AWG #18)
and cycle period of within 5 cm (2").
Termination processing depends on the type of device being
deployed. For FVP110, use an M4 screw terminal claw. Some
hosts require a connector.
Refer to GE Masoneilan when making arrangements to purchase the recommended
equipment.
The number of devices that can be connected to a single bus and the cable length vary
depending on system design.
When constructing systems, both the basic and overall design must be carefully
considered to allow device performance to be fully exhibited.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......