![GE FVP110 Скачать руководство пользователя страница 170](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072170.webp)
FVP 110 Fieldbus Valve Positioner Manual
154
GE Energy
The major functions of the block are shown in Figure 69.
Figure 69
Function Diagram of AR Function Block
The range extension function has a graduated transfer, controlled by two constants
referenced to IN. An internal value, g, is zero for IN less than RANGE_LO. It is one when
IN is greater than RANGE_HI. It is interpolated from zero to one over the range of
RANGE_LO to RANGE_HI. The equation for PV follows:
PV = g * IN + (1-g) * IN_LO
If the status of IN_LO is unusable and IN is usable and greater than RANGE_LO, then set
g
to one. If the status of IN is unusable, and IN_LO is usable and less than RANGE_HI,
then g should be set to zero. In each case the PV should have a status of Good until the
condition no longer applies. Otherwise, the status of IN_LO is used for the PV if g is less
than 0.5, while IN is used for g greater than or equal to 0.5. An optional internal hysteresis
can be used to calculate the status switching point.
Six constants are used for the three auxiliary inputs. Each has a BIAS_IN_i and a
GAIN_IN_i. The output has a BIAS and a GAIN static constant. For the inputs, the bias is
added and the gain is applied to the sum. The result is an internal value called t_i in the
function equations. The equation for each auxiliary input is the following:
t_i = (IN_i + BIAS_IN_i) * GAIN_IN_i
The flow compensation functions have limits on the amount of compensation applied to
the PV, to assure graceful degradation if an auxiliary input is unstable. The internal limited
value is f.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......