![GE FVP110 Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072037.webp)
21
CENELEC ATEX (KEMA)
Safety
When combined with Trapezoidal or Rectangular output characteristic FISCO model IIB
barrier
❑
Ui = 17.5 V, Ii = 380 mA, Pi = 5.32 W,
❑
Cint = 1.76 nF, Lint = 0
μ
H
[For 1D]
Group: 1D
Maximum Surface Temperature for dust proof: T100 °C
Ambient Temperature for 1D: -40 °C to +80 °C
Degree of Protection of the Enclosure: IP65
Electrical Data
Un=32.0 V
Note 3. Installation
All wiring shall comply with local installation requirements (Refer to Figure 5 on
page 18).
Note 4. Maintenance and Repair
The instrument modification or parts replacement by other than authorized
representative of GE Masoneilan is prohibited and will void KEMA Intrinsically safe
Certification.
Note 5. Special Conditions for Safe Use
In the case where the enclosure of the Valve Positioner is made of aluminum, if it is
mounted in an area where the use of category 1G apparatus is required, it must be
installed such, that even in the event of rare incidents, ignition sources due to impact
and friction sparks are excluded.
Note 6. Installation Instructions
When used in a potentially explosive atmosphere, requiring the use of apparatus of
equipment category 1D, suitable certified cable entry devices or certified blanking
elements with a degree of ingress protection of at least IP6X according to EN 60529
shall be used and correctly installed.
Note 7. Installation
When used in potentially explosive atmosphere for category 1D, need not use safety
barrier.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......