![GE FVP110 Скачать руководство пользователя страница 80](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072080.webp)
FVP 110 Fieldbus Valve Positioner Manual
64
GE Energy
Set Transducer Block Parameters
Set the following parameters as necessary. For the settings made as default when
shipped, see the parameter lists in “Function Block Parameters” on page 183.
1. Write the Position-to-flow Rate Characteristic Type.
The parameter POSITION_CHAR_TYPE defines the characteristics between the valve
position and flow rate, and is set to linear by default. Write the appropriate value:
❑
1 = linear
❑
2 = equal percent (50:1)
❑
3 = equal percent (30:1)
❑
4 = quick open (reversal of equal % - 50:1)
❑
5 = Camflex Percentage
❑
255 = user-defined
255 allows you to define the desired characteristics by 10 line segments for evenly
divided input levels. The coordinates (0,0) and (100,100) are fixed; set the values
corresponding to OUT (Output of AO block) = 10%, 20%, 30%..., 80%, 90%.A set value
must be greater than the preceding set value; the output must increase as the input
increases (Figure 38).
Figure 38
Position-to-flow Rate Characteristic Type
2. Set Final-value Limits.
Eu_100 and Eu_0 in the parameter FINAL_VALUE_RANGE define the upper and lower
limits of FINAL_VALUE.value of the transducer block.
NOTE
Even if the range of FINAL_VALUE.value is limited by
FINAL_VALUE_RANGE, the actual valve position is set to
outside the FINAL_VALUE_RANGE setting when the
tight-shut or full-open action described below is activated.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......