![GE FVP110 Скачать руководство пользователя страница 196](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072196.webp)
FVP 110 Fieldbus Valve Positioner Manual
180
GE Energy
Valve responses are too
slow.
If only the responses that
require air suction are slow, it
means that the regulator’s
maximum capacity is large
enough.
Replace the regulator.
—
The I/P module’s nozzle has
become blocked from dirt
contained in the air supply or
the like.
Check whether or not error
114 or 122 occurs in
XD_ERROR in steady
states. If it does occur,
contact the nearest
service station or
representative office.
The control relay’s nozzle has
become blocked from dirt
contained in the air supply or
the like.
Check whether or not error
114 or 122 occurs in
XD_ERROR in steady
states.
The control gain is insufficient. Write 4 or 3 to
AUTO_TUNE_EXEC to
redo auto tuning. Or,
increase the
SERVO_GAIN setting.
❑
“Carrying out
Tuning” on
page 61
❑
“Control
Parameters”
on page 132
❑
“Function
Block Parame-
ters” on
page 183
❑
“Manual Tun-
ing Guideline”
on page 253
There’s air leak from the pipe
of output pressure, or
feedback lever is not correctly
attached.
Check the piping and
attachment of the lever,
and write 4 or 3 to
AUTO_TUNE_EXEC to
redo autotuning.
❑
“Installing the
FVP110 on the
Actuator” on
page 35
❑
“Carrying out
Tuning” on
page 615.3
The pressure balance
deviation is too large.
Adjust the pressure
balance of control relay.
“Tuning the
Pressure Balance
of Control Relay”
on page 71
Table 57
Troubleshooting Valve Control (Continued)
Problem
Presumed Cause
Remedy
See Section
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......