FVP 110 Fieldbus Valve Positioner Manual
92
GE Energy
Definition of Combining Function Blocks
The input/output parameters for function blocks are combined. Practically, the setting is
written to the FVP110 link object. See “Block Setting” on page 96 for details.
For the FVP110, in order to minimize the delay in data transfer between Transducer block
and AO function block, transducer blocks are designed to execute in conjunction with the
execution of AO function block. Therefore, in order to activate Transducer block, it is
necessary that AO function block is always defined in the schedule.
Execute the combined blocks synchronously with other blocks on the communications
schedule. In this case, change the FVP110 schedule according to Table 14. FVP110
schedule is set as shown in Table 14; change it as necessary.
Maximum execution times are:
❑
95 ms for AO block
❑
40 ms for each DI block
❑
95 ms for an OS block
❑
120 ms fora PID block.
For scheduling of communications for combination with the next function block, the
execution is arranged to start after a lapse of longer than the times above mentioned. Two
FVP110 function blocks
cannot
execute at the same time (execution time is overlapped).
Table 14
Execution Schedule of the FVP110 Function Blocks
Index
Parameters
Setting (Enclosed is factory-setting)
269
(SM)
MACROCYCLE_
DURATION
Cycle (MACROCYCLE) period of control or
measurement. Unit is 1/32 ms. (32000 = 1 s)
276
(SM)
FB_START_ENTRY.1
AO block startup time. Elapsed time from the
start of MACROCYCLE specified in 1/32 ms.
(32000 = 1 s)
278
(SM)
FB_START_ENTRY.2
-
.
.
.
289
(SM)
FB_START_ENTRY.14
-
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......