![GE FVP110 Скачать руководство пользователя страница 72](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072072.webp)
FVP 110 Fieldbus Valve Positioner Manual
56
GE Energy
4. Mount the flameproof packing adapter body to conduit connection (Figure 36) by:
a. Screwing the flameproof packing adapter into the terminal box until the O-ring
touches the wiring port (at least 6 full turns), and firmly tightening the lock nut.
b. Inserting the cable through the union cover, the union coupling, the clamp nut, the
clamp ring, the gland, the washer, the rubber packing, and the packing box, in that
order.
c. Inserting the end of the cable into the terminal box.
d. Tightening the union cover to grip the cable. When tightening the union cover,
tighten approximately one turn past the point where the cable no longer moves up
and down.
CAUTION
Proper tightening is important. If it is too tight, a circuit break
in the cable can occur; if not tight enough, the flameproof
effectiveness is compromised.
e. Fastening the cable by tightening the clamp nut.
f.
Tightening the lock nut on the union cover.
g. Connecting the cable wires to each terminal.
Figure 36
Installing Flameproof Packing Adapter
Table 4
Flameproof Packings and Applicable Cable Outer Diameters
Optional
Code
Wiring Port
Thread
Diameter
Applicable
Cable OD
(mm)
Identifying
Mark
F1
G 1/2
8 to 10
10.1 to 12
16 8-10
16 10-12
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......