FVP 110 Fieldbus Valve Positioner Manual
134
GE Energy
The AO function block performs bi-directional signal handling (Figure 58): transfer of the
valve control signal to the transducer block (forward path) and feedback of the valve
position signal from the transducer block to the upstream block (backward path).
Figure 58
Function Diagram of AO Function Block
Modes
The target mode for the AO function block can be set from five block modes: RCas, Cas,
Auto, Man, and O/S. Regardless of the target mode, the AO block automatically enters
the IMan or LO mode when a specified condition is met (such as when another function
block enters a specific status) depending on the parameter settings.
Forward Path
The following describes the signal input from the upstream block to the AO block and then
passed to the transducer block. The upstream block is typically the PID controller block,
and the control signal from the PID block is input as the source of computing the setpoint
SP for the AO block.
The path for computing the SP differs depending on the mode: In Cas mode, CAS_IN is
used for SP. In RCas mode, RCAS_IN is used for SP. If the value of CAS_IN or
RCAS_IN, whichever is used, is greater than SP_HI_LIM (high limit) or less than
SP_LO_LIM (low limit), the internal SP is set to the respective limits. Also, if the rate of
change in the value of CAS_IN or RCAS_IN, whichever is used, is greater than
SP_RATE_UP (rate-of increase limit) in the increasing direction, or than SP_RATE_DN
(rate-of-decrease limit) in the decreasing direction, the change in internal SP is limited by
the corresponding rate-of-change limit setting.
In RCas, Cas or Auto mode, the SP value is used for the AO block’s output OUT, whose
value is then passed to the transducer block via channel 1.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......