![GE FVP110 Скачать руководство пользователя страница 186](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072186.webp)
FVP 110 Fieldbus Valve Positioner Manual
170
GE Energy
Integration Functions
The transducer block has the parameters containing an integrated operation result
quantity (Table 54).
Each integrated value is associated with a parameter specifying a threshold. Setting the
desired value for a threshold raises a block alarm when that value is reached. The total
travel is useful for various purposes, such as for anticipating possible degradation of the
valve and determining appropriate timing for maintenance. To reset these integrated
values, write
0
to the respective parameters. Use caution as the previous value cannot be
restored after being reset.
Table 54
FVP110’s Parameters Containing Integrated Operation Result Quantity
Item
Parameter (upper:
integrated value; lower:
threshold)
Description
Total number of times of
changes in direction of
valve actions
TOTAL_CYCLE_COUNT
CYCLE_COUNT_LIM
Incremented by 1 at each change in the
direction of the valve action. The dead band
can be set in CYCLE_DEADBAND.
Total travel (%)
TOTAL_TRAVEL
TRAVEL_LIM
Total travel distance of the stem position,
regardless of the direction of the travel,
represented as a percentage of the valve
position span (full stroke).
The dead band can be set in
CYCLE_DEADBAND.
Total close time (hours)
TOTAL_CLOSE_TIME
CLOSE_TIME_LIM
Integrated time periods when the valve position
is equal to or less than the threshold set in
OPEN_CLOSE_THRESHOLD.
Total open time (hours)
TOTAL_OPEN_TIME
OPEN_TIME_LIM
Integrated time periods when the valve position
is larger than the threshold set in
OPEN_CLOSE_THRESHOLD.
Total near close time
(hours)
TOTAL_NEAR_CLOSE_TIM
NEAR_CLOSE_TIME _LIM
Integrated time periods when the valve position
is between a shutoff and the threshold set in
NEAR_CLOSE_THRESHOLD.
Useful to predict deterioration of valve body.
Total number of times of
servo output drift warning.
SERVO_WARN_COUNT
Indicates the total number of times a drift
warning occurred regarding the output current
to the I/P module.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......