FVP 110 Fieldbus Valve Positioner Manual
196
GE Energy
90
2090
RELEASE
_FAILSAFE
As specified
upon ordering
O/S
Used to release the block from the fail-safe
state.
When the value of this parameter is 3, writing 1
will release the block from the fail-safe state.
1 = clear, non-latch (normal state)
2 = active, latched (during fail-safe state)
3 = clear, latched (cause has been cleared but
failsafe action is still on).
91
2091
MODEL
As specified
upon ordering
—
Model code
92
2092
DEV_
OPTIONS
0x000D (or
0X0001 if PID
option is
specified)
—
Indicates whether any software options are
provided.
93
2093
PRESS_
SENS
_INSTALLED
1
—
Indicates whether a pressure sensor is
equipped:
1 = equipped
2 = not equipped
94
2094
ACTUATOR_
TYPE
As specified
upon ordering
—
Actuator type
1 = single acting
2 = double acting
95
2095
RELAY_TYPE 1
Control relay type:
1 = direct acting
96
2096
SIGN_MEAS_
EXEC
1
O/S
Carries outs signature measurement. 1 = off
97
2097
SIGN_MEAS
_RESULT
1
—
Indicates the signature measurement status
and result.
1 = succeeded
98
2098
SIGN_MEAS_
STATE
0
—
Indicates the progress of signature
measurement.
99
2099
SIGN_MEAS
_COUNTER
0
—
Indicates the number of measured data sets.
The count is reset to zero when the power is
turned off or measurement of a new signature
is performed.
Table 61
Transducer Block Parameters (Continued)
Relative
Index
Index
Parameter
Name
Default
(factory
setting)
Write
Description
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......