![GE FVP110 Скачать руководство пользователя страница 154](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072154.webp)
FVP 110 Fieldbus Valve Positioner Manual
138
GE Energy
(*1) The modes to which the AO block can transfer are limited to those set in
MODE_BLK.permitted, and the priority levels of modes (Figure 59). In fact, if Normal
shed, normal return is set for SHED_OPT, the detection of a computer failure causes
MODE_BLK.actual to change to Cas, Auto, or Man, whichever is set in
MODE_BLK.permitted and has the lowest priority level.
Figure 59
Mode Priority Levels
(*2) Only when Auto is set as permitted mode.
NOTE
If a control block is connected as a cascade primary block of
the AO block, a mode transition of the AO block to Cas occurs
in the following sequence due to initialization of the cascade
connection: RCas —> Auto —> Cas.
Initialization at Start
To prevent a sudden change in output when the AO block carries out the specified actions
for the first time after the power is turned on, it:
1. Equalizes SP to PV if the Faultstate Type option (bit no. 7) in IO_OPTS is false.
2. Equalizes OUT to READBACK.
If the Faultstate Type option (bit no. 7) in IO_OPTS is true, it restores FSTATE_VAL in SP.
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......