![GE AKTA ready Скачать руководство пользователя страница 88](http://html.mh-extra.com/html/ge/akta-ready/akta-ready_operating-instructions-manual_128010088.webp)
Mount the inlet manifold
Action
Step
Open the plastic package containing
the inlet manifold and main part of
the flow kit.
1
Retrieve the inlet manifold and mount
it on the system cabinet by inserting
each inlet tubing into the correspond-
ing inlet pinch valve (XV-001 to XV-
006). Do not yet remove the end caps.
2
Close each safety lock on the pinch valves by turning the black handles 180
degrees.
3
Attach the main part tubing
Action
Step
Lift the main part of the flow kit
(see image) using:
•
your left hand to hold the
tubing by the air trap
•
your right hand to hold the
UV cell. Avoid touching the
window.
1
Place the air trap in its holder,
and insert the UV cell in the slot
to the right of the air trap. Push
the UV cell all the way in. A soft
click indicates that it is properly
positioned.
2
Place the outlet manifold in the gap between of the cabinet and the front
cabinet door for the time being. (Do not mount it yet.)
3
88
ÄKTA ready Operating Instructions 28960345 AD
6 Flow kit installation
6.3 Mounting the flow kit