![GE AKTA ready Скачать руководство пользователя страница 174](http://html.mh-extra.com/html/ge/akta-ready/akta-ready_operating-instructions-manual_128010174.webp)
Prime the system
Before starting a run, make sure that the flow path, including hoses to inlet containers,
are filled with liquid and that no air bubbles remain in the system.
The air trap can only remove small amounts of air. If air reaches the flow meter during
a run, the alarm “Uncertain flow“ will be displayed and the system will enter pause mode.
Priming should be done for each inlet, starting with inlet 1. Use the ManFlow command
to control the pump during priming.
174
ÄKTA ready Operating Instructions 28960345 AD
11 Run a method
11.1 Final preparations before a run