![GE AKTA ready Скачать руководство пользователя страница 184](http://html.mh-extra.com/html/ge/akta-ready/akta-ready_operating-instructions-manual_128010184.webp)
12.1
Daily maintenance
General
Regular maintenance is important for safe and trouble-free operation of the ÄKTA ready.
This section provides instructions for daily maintenance by the user. Daily maintenance
mainly includes cleaning and calibration of the pH electrode.
WARNING
Electrical shock hazard. All installation, service and maintenance
of components inside the electronics cabinet should be done by
service personnel authorized by GE Healthcare. Do not open any
covers or replace parts unless specifically stated in the Operating
Instructions.
184
ÄKTA ready Operating Instructions 28960345 AD
12 Maintenance
12.1 Daily maintenance