![GE AKTA ready Скачать руководство пользователя страница 180](http://html.mh-extra.com/html/ge/akta-ready/akta-ready_operating-instructions-manual_128010180.webp)
11.4
After the run
General
If flow kit and column should be disposed of, this must be done in accordance with local
regulations. Preparing the flow kit and column for disposal involves washing the flow kit
and column, draining any liquid from them, and remounting the protective caps they
were delivered with. Disconnect the pH electrode when the run is completed.
Disposing of flow kit and column
WARNING
Hazardous chemicals during run. When using hazardous chemi-
cals, run System CIP and Column CIP to flush the entire system
tubing with distilled water, before service and maintenance.
If the flow kit and column are to be dismounted and disposed of, proceed as follows:
Action
Step
While still mounted on the system cabinet, wash the flow kit and column
with water. This is done by connecting water to one or more of the inlets
and running a washing method from the ÄKTA ready.
1
Fill the flow kit and column with air by pumping air from an empty inlet.
2
Note:
Use ManFlow when filling the system with air. The flow meter, which is used
to control the pump, does not work with air in the system.
Disconnect all inlet and outlet containers, and the column, and put back the
protective caps delivered with the flow kit (the caps that were removed when
mounting the flow kit).
3
Put the welded tubing ends back on the column's inlet and outlet.
4
Open all valves by turning the Installation switch to the FLOW KIT INSTALL
position.
5
Remove all flow kit sensors from their holders/connectors. Wipe clean the
contact surfaces of the flow cell connectors.
6
Open all manual valve locks by turning the black handles 180 degrees.
7
180
ÄKTA ready Operating Instructions 28960345 AD
11 Run a method
11.4 After the run