5-302
L60 LINE PHASE COMPARISON SYSTEM – INSTRUCTION MANUAL
CONTROL ELEMENTS
CHAPTER 5: SETTINGS
5
Table 5-39: Autoreclose programs
The four autoreclose modes are described as follows:
•
1 & 3 Pole
— In this mode, the autorecloser starts the
AR 1-P DEAD TIME
timer for the first shot if the autoreclose is
single-phase initiated, the
AR 3-P DEAD TIME 1
timer if the autoreclose is three-pole initiated, and the
AR 3-P DEAD TIME 2
timer if the autoreclose is three-phase time delay initiated. If two or more shots are enabled, the second, third, and
fourth shots are always three-pole and start the
AR 3-P DEAD TIME 2(4)
timers.
•
1 Pole
— In this mode, the autorecloser starts the
AR 1-P DEAD TIME
for the first shot if the fault is single phase. If the
fault is three-phase or a three-pole trip on the breaker occurred during the single-pole initiation, the scheme goes to
lockout without reclosing. If two or more shots are enabled, the second, third, and fourth shots are always three-pole
and start the
AR 3-P DEAD TIME 2(4)
timers.
•
3 Pole-A
— In this mode, the autorecloser is initiated only for single phase faults, although the trip is three pole. The
autorecloser uses the
AR 3-P DEAD TIME 1
for the first shot if the fault is single phase. If the fault is multi phase the
scheme goes to Lockout without reclosing. If two or more shots are enabled, the second, third, and fourth shots are
always three-phase and start the
AR 3-P DEAD TIME 2(4)
timers.
•
3 Pole-B
— In this mode, the autorecloser is initiated for any type of fault and starts the
AR 3-P DEAD TIME 1
for the first
shot. If the initiating signal is
AR 3P TD INIT
the scheme starts
AR 3-P DEAD TIME 2
for the first shot. If two or more shots
are enabled, the second, third, and fourth shots are always three-phase and start the
AR 3-P DEAD TIME 2(4)
timers.
Basic reclosing operation
Reclosing operation is determined primarily by the
AR MODE
and
AR BKR SEQUENCE
settings. The reclosing sequences are
started by the initiate inputs. A reclose initiate signal sends the scheme into the reclose-in-progress (RIP) state, asserting
the
AR RIP
FlexLogic operand. The scheme is latched into the RIP state and resets only when an
AR CLS BKR 1
(autoreclose
breaker 1) or
AR CLS BKR 2
(autoreclose breaker 2) operand is generated or the scheme goes to the Lockout state.
The dead time for the initial reclose operation is determined by the
AR 1-P DEAD TIME
,
AR 3-P DEAD TIME 1
, or
AR 3-P DEAD
TIME 2
setting, depending on the fault type and the mode selected. After the dead time interval the scheme asserts the
AR
CLOSE BKR 1
or
AR CLOSE BKR 2
operands, as determined by the sequence selected. These operands are latched until the
breaker closes or the scheme goes to Reset or Lockout.
There are three initiate programs: single pole initiate, three pole initiate, and three pole time delay initiate. Any of these
reclose initiate signals start the reclose cycle and set the reclose-in-progress (
AR RIP
) operand. The reclose-in-progress
operand is sealed-in until the Lockout or Reset signal appears.
The three-pole initiate and three-pole time delay initiate signals are latched until the
AR CLOSE BKR1
,
AR CLOSE BKR2
, Lockout,
or Reset signal appears.
Autoreclose pause
The pause input offers the possibility of freezing the autoreclose cycle until the pause signal disappears. This can be done
when a trip occurs and simultaneously or previously, some conditions are detected such as out-of step or loss of guard
frequency, or a remote transfer trip signal is received. The pause signal freezes all four dead timers. When the ‘pause’
signal disappears the autoreclose cycle is resumed by continuing the shot timer it was left at when paused.
Mode
Autoreclose
mode
First shot
Second shot
Third shot
Fourth shot
Single-
phase fault
Multi-phase
fault
Single-
phase fault
Multi-phase
fault
Single-
phase fault
Multi-phase
fault
Single-
phase fault
Multi-phase
fault
1
1 & 3 Pole
1 Pole
3 Pole
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
2
1 Pole
1 Pole
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3
3 Pole-A
3 Pole
Lockout
3 Pole or
Lockout
Lockout
3 Pole or
Lockout
Lockout
3 Pole or
Lockout
Lockout
4
3 Pole-B
3 Pole
3 Pole
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
3 Pole or
Lockout
Содержание L60
Страница 130: ...4 30 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL LOGIC DIAGRAMS CHAPTER 4 INTERFACES 4 ...
Страница 464: ...5 334 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL TESTING CHAPTER 5 SETTINGS 5 ...
Страница 498: ...7 10 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL TARGETS MENU CHAPTER 7 COMMANDS AND TARGETS 7 ...
Страница 570: ...10 14 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL DISPOSAL CHAPTER 10 MAINTENANCE 10 ...
Страница 582: ...A 12 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL FLEXANALOG ITEMS APPENDIX A FLEXANALOG OPERANDS A ...
Страница 588: ...C 4 L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL REVISION HISTORY APPENDIX C MISCELLANEOUS C ...
Страница 592: ...iv L60 LINE PHASE COMPARISON SYSTEM INSTRUCTION MANUAL ABBREVIATIONS ...