page
~
iv
STEP 10.
Wiring Field Devices to all Interface Boards
2-67
10.1 Field Wiring Standard Readers to the 635 DRM Board ................................................................................... 2-68
10.2 Field Wiring the SIGMA Morpho to the 635 DRM........................................................................................... 2-70
10.3 Field Wiring the 635 DRM for ANTI PASSBACK .............................................................................................. 2-71
10.4 Field Wiring the DIO - Digital Input/Output board ......................................................................................... 2-72
10.5 About setting up Supervision & Hypervision of Inputs ................................................................................... 2-73
SUPERVISION OF INPUTS:
2-73
HYPERVISION OF INPUTS:
2-74
10.6 Field Wiring the 635-Input Modules to the 635-DSI Board ............................................................................. 2-75
10.7 Field Wiring Output Relay Boards to the 635-DSI Board ................................................................................. 2-76
10.7 Field Wiring Schlage AD PIMs to the 635-DSI Board ....................................................................................... 2-77
10.8 Field Wiring 635-DRM Remote Door Module to the 635 DSI Multidrop ......................................................... 2-78
10.9 Field Wiring Cypress Clock to 635-DSI Board .................................................................................................. 2-79
10.10 Field Wiring LCD Display Unit to 635-DSI Board - ......................................................................................... 2-80
STEP 11.
Walk-Test the System (recommended)
2-81
11.1 Quick Steps to Software Setup ....................................................................................................................... 2-81
11.2 Quick Steps to creating a Test Card ................................................................................................................ 2-82
3
Communication /Event Server Overview
3-1
3.1
Description of the Communication Server
3-1
3.2
IP Connections between Services
3-2
3.3
Opening the GCS Event Service window:
3-3
3.4
Managing the 600 Controller Connections:
3-3
3.5
Managing the TCP/IP Service Connections:
3-4
3.6
About the Status of Connections:
3-5
3.7
Configuring the Controller Connection Settings:
3-6
3.8
Configuring the TCP/IP Client Server Settings:
3-7
3.9
Configuring the ODBC Settings:
3-8
4
Hardware Troubleshooting
4-1
4.1
Troubleshooting Connectivity and Red-X on Loops
4-2
4.2
Verifying connections between Services
4-3
4.3
Verifying settings in SG Properties Screens
4-6
4.4
Verifying settings at the Controller (CPU)
4-7
A
– Appendix : Programming Templates
A-1
A.1
DPI - Reader port programming
A-1
A.2
DIO port programming
A-2