17.2 Storage Expansion - Scale
7. Turn on both PSU switches on the rear side of each storage module.
8. If the ETERNUS CS800 S6 was shut down prior to adding the new hardware, turn on the
server by pressing its power ON/OFF button now.
Otherwise, if the system was operable while the new disks were added, initiate a
reboot via the remote management pages (see
"Reboot & Shutdown" on page 430
).
9. Wait at least 15 minutes before starting any further actions. The integration of the
added disks takes place automatically, no further actions are required.
17.2 Storage Expansion - Scale
Table below shows the numbering schemes for the storage array(s). Figure below shows
the recommended mounting positions of the modules in the rack.
Storage Modules
Denotation
DX100 S3 base
CE
1 DX100 S3 expansion module on the DX100 S3 base
DE-1
2 DX100 S3 expansion module on the DX100 S3 base
DE-2
3 DX100 S3 expansion module on the DX100 S3 base
DE-3
...
...
10th DX100 S3 expansion module on the DX100 S3 base
DE-a
Table 29: Numbering of the Storage Modules for a Scale System
Figure 324: Recommended Positions of the Modules in the Rack for Scale
ETERNUS CS800
456
Содержание ETERNUS CS800 S6
Страница 1: ...English ETERNUS CS800 S6 User Guide V3 2 7 Edition April 2017 ...
Страница 131: ...7 3 The Remote Management Console Figure 98 Remote Management Pages Map ETERNUS CS800 131 ...
Страница 173: ...8 8 AIS Connect Figure 132 AISConnect Wizard Confirm ETERNUS CS800 173 ...
Страница 449: ...16 2 Storage Subsystem Figure 313 Inserting the 3 5 inch HDD module ETERNUS CS800 449 ...