Installation Sequence
Before attempting to install the alarm system, read this section.
Once you have an overall understanding of the installation
sequence, carefully work through each step.
1. Design the Layout
Make a rough sketch of the premises to get an idea of where all
alarm detection devices, keypads and other modules are to be
located.
2. Mounting the Control Panel
The control panel must be mounted within the protected area close
to an AC power source.
You must complete all wiring before connecting the battery, or
applying AC to the panel.
3. Install the Remote Keypads
Mount the remote keypads at locations that are easily accessible
during entry and exit from the protected area. Connect the remote
keypads to the control panel.
4. Zone Wiring
Install detection devices and connect to control panel or expander.
5. Other Wiring
Complete all other wiring including external/internal sounders and
telephone line connections.
6. Apply Power to the Control Panel
Once steps 1 to 5 are completed, apply power to the control panel.
First, connect the red battery lead to the positive terminal and the
black lead to negative. Then, connect the AC.
7. Program the System
If available use the Rhino UDL software package to program the
system, if this is not available program this system in accordance
with the procedures in Section 3.
8. Testing the System
Test the system thoroughly to ensure that all features and functions
are operating as required.
Control Panel
Mounting
Mount the control panel on a flat, plumb wall using at least three
appropriate screws. The rear casing has been designed with a
several key-hole slots so that mounting is possible without removing
the Printed Circuit Board (PCB).
It is essential to ensure that none of the fixing slots or cable entries
are accessible after fixing.
Wiring the Control Panel
WARNING: ELECTRICITY CAN KILL
BEFORE connecting the control panel ALWAYS
disconnect the supply at the consumer unit.
If in ANY doubt consult a qualified electrician.
ONLY connect the mains supply from the transformer to
the mains terminal block, NEVER connect the mains
supply directly to the PCB.
The system installation MUST be carried out in
accordance with the national safety standards, for
example EN 60950: 1992.
ALWAYS refer to National Wiring Regulations when
conducting installation.
An appropriate and readily accessible disconnection
device (e.g. an unswitched fused spur) MUST be provided
as part of the installation.
The disconnection device must NOT be fitted in a flexible
cord.
Where identification of the neutral in the mains supply is
NOT possible, a two-pole disconnection device MUST be
used.
The building mains supply MUST incorporate appropriate
short-circuit backup protection (e.g. a fuse or circuit
breaker) of High Breaking Capacity (HBC, at least 1500A).
Use mains cable of adequate carrying capacity for the
rated current (i.e. at least 0.75mm2).
The system installation MUST be carried out in
accordance with the expected norms in the industry, for
example, SAIDSA By-law 5 and By-law 25 (amongst
others).
Содержание RHINO 816
Страница 1: ......
Страница 4: ...4 FSK RAP816 V2015 04 1 System Overview System Configuration ...
Страница 45: ...FSK RAP816 V2015 04 45 ...
Страница 50: ...50 FSK RAP816 V2015 04 Technical Support Email techadmin fsk co za ...
Страница 51: ......