12
Kongsberg C-series
HPMU Park Position
A
HPMU Park Position
is available on the
gallows stand.
Use the park position for safe
HPMU Tool
Head
storage.
Note: For safety reasons, always insert a
Dummy Bit
when parking.
Lift HPMU in / out of Park Position
1.
Move the Y-carriage to a position close to
the gallows stand.
2.
Move
HPMU
to / from
HPMU Park
Position
as illustrated.
Chiller / HPMU start up time
Depending upon the environmental temperature, the
Chiller
needs some start-up time after
Power On
before it is ready to operate.
Typical delay is 2 – 3 minutes.
98
Содержание Kongsberg C series
Страница 1: ...Kongsberg C series User Manual 05 2018 C series ...
Страница 8: ...Kongsberg C series 22 1 Machine 266 22 2 Tools 266 22 3 iPC 267 viii ...
Страница 40: ...7 Kongsberg C series 40 ...
Страница 65: ...10 Kongsberg C series 10 17 Board Size Not implemented yet 65 ...
Страница 171: ...14 Kongsberg C series Fuse F2 T2 5 A 250V 5x20mm 44347540 The same fuse size is used regardless 115V 230V 171 ...
Страница 214: ...18 Kongsberg C series Ensure the faulty situation is removed Press Safety Reset on Board Feeder to continue 214 ...
Страница 264: ...20 Kongsberg C series 5 Lift and turn the container to release it from the fixture 6 Empty the container 264 ...