Contents
6.4. Main Power Switch
.........................................................................................................................
30
6.5. Operator Panel
................................................................................................................................
30
6.6. Traverse Panel
.................................................................................................................................
34
6.7. Foot Pedal
........................................................................................................................................
34
6.8. High Pressure Air System
...............................................................................................................
34
6.9. Application Programs Available
.....................................................................................................
35
7. Basic Operations
.....................................................................................................................................
36
7.1. Introduction
.....................................................................................................................................
36
7.2. Power On Sequence
.......................................................................................................................
36
7.3. Reset Safety System
........................................................................................................................
38
7.4. Power Off Sequence
.......................................................................................................................
38
7.5. Continue after Safety Break
...........................................................................................................
39
8. Prepare for a Job
.....................................................................................................................................
41
8.1. Introduction
.....................................................................................................................................
41
8.2. Create Job
........................................................................................................................................
41
8.3. Layer Setup
......................................................................................................................................
41
8.4. Production Setup
............................................................................................................................
42
8.5. Speed Setting
...................................................................................................................................
42
8.6. Flute/Grain Direction
.......................................................................................................................
42
8.7. Vacuum Zone Selection
..................................................................................................................
42
8.8. Job Execution
...................................................................................................................................
43
8.9. Corrugated Production
...................................................................................................................
44
8.10. Milling Production
.........................................................................................................................
44
8.11. Make a Pen Plot
............................................................................................................................
44
9. How To Procedures, Advanced
.............................................................................................................
45
9.1. Cutting Thick Materials
...................................................................................................................
45
9.2. Hard Board Production
..................................................................................................................
45
9.3. Multi Pass Creasing or Milling
.......................................................................................................
46
9.4. Jobs including Reverse Operations
................................................................................................
47
9.5. Work with different Reference Point Settings
..............................................................................
48
9.6. MultiZone Production
.....................................................................................................................
48
9.6.1. MultiZone, Workflow
.............................................................................................................
50
10. System Setup
.........................................................................................................................................
52
10.1. Introduction
...................................................................................................................................
52
10.2. Adjust X1 to X2 Angle
...................................................................................................................
53
10.3. Register Table Size
........................................................................................................................
54
10.4. Adjust Measuring Station Position
..............................................................................................
54
10.5. Set Ruler Position
..........................................................................................................................
54
10.6. Set Main Reference Point
.............................................................................................................
55
10.7. Map Table Top Surface
.................................................................................................................
55
10.8. Calibrate Foot on Measuring Station
..........................................................................................
56
iii
Содержание Kongsberg C series
Страница 1: ...Kongsberg C series User Manual 05 2018 C series ...
Страница 8: ...Kongsberg C series 22 1 Machine 266 22 2 Tools 266 22 3 iPC 267 viii ...
Страница 40: ...7 Kongsberg C series 40 ...
Страница 65: ...10 Kongsberg C series 10 17 Board Size Not implemented yet 65 ...
Страница 171: ...14 Kongsberg C series Fuse F2 T2 5 A 250V 5x20mm 44347540 The same fuse size is used regardless 115V 230V 171 ...
Страница 214: ...18 Kongsberg C series Ensure the faulty situation is removed Press Safety Reset on Board Feeder to continue 214 ...
Страница 264: ...20 Kongsberg C series 5 Lift and turn the container to release it from the fixture 6 Empty the container 264 ...