Figure 3-14: Shroud latch retainer
A. Shroud strike
B. Shroud latch
C. Shroud latch retainer
3. Carefully, lift the band shroud from the meter body (see
).
4. Move the shroud assembly and latches out of your immediate work area.
5. Repeat for the other latch.
This completes the latched single band shroud removal procedure.
3.5
Re-wet the transducers
This procedure applies to meters with direct mount or remote mount electronics
enclosures. If the chord signal quality diminishes, re-wet the transducers to improve the
signal strength.
Table 3-5: Transducer maintenance tools and shop supplies list
Tools required
Retaining ring pliers (Rosemount P/N 1-504-90-043 or or Stanley Proto #J371 or #371L)
MeterLink, or AMSTM Device Manager or a Field Communicator
(1)
Dow Corning 200 is a trademark of Dow Corning Corporation, U.S.A.
Procedure
1. Disassemble the shrouds. Refer to the appropriate sections below for your meter:
•
•
•
•
Meter maintenance
Maintenance and Troubleshooting Manual
April 2022
00809-0100-3812
52
Emerson.com/Rosemount
Содержание Rosemount 3812
Страница 4: ...Contents Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 4 Emerson com Rosemount ...
Страница 12: ...Routine Maintenance Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 12 Emerson com Rosemount ...
Страница 36: ...Troubleshooting Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 36 Emerson com Rosemount ...
Страница 126: ...Meter maintenance Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 126 Emerson com Rosemount ...
Страница 130: ...Engineering drawings Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 130 Emerson com Rosemount ...