Figure 3-72: 12” and larger meters band shroud
A. Top end shroud
B. End shroud security seal and bolts
C. Base electronics shroud
8. Align the top end bolt holes with the two tapped holes in the body end pocket.
9. Place a lock washer onto a top end shroud bolt and install the bolt into the tapped
hole in the body end. Rotate the bolt clockwise and tighten with a 1/2 inch wrench.
Repeat this with another bolt and lock washer into the second hole in the body end.
10. Repeat
for the second clamped shroud.
11. If required, install band shroud security seals. Install the security seal wire into and
through one of the two holes in the shroud bolts (
This completes the clamped band shroud installation procedure.
3.10.3
Install split shrouds
WARNING
CUTTING HAZARD
Sharp edges may be present on the band shrouds.
Wear appropriate personal protective equipment when working on the meter.
Failure to comply may cause serious injury.
Procedure
1. For direct mount electronics, install the upper split shroud during the assembly of
the Base Enclosure or, for remote mount electronics, during the junction box
assembly.
Meter maintenance
Maintenance and Troubleshooting Manual
April 2022
00809-0100-3812
112
Emerson.com/Rosemount
Содержание Rosemount 3812
Страница 4: ...Contents Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 4 Emerson com Rosemount ...
Страница 12: ...Routine Maintenance Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 12 Emerson com Rosemount ...
Страница 36: ...Troubleshooting Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 36 Emerson com Rosemount ...
Страница 126: ...Meter maintenance Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 126 Emerson com Rosemount ...
Страница 130: ...Engineering drawings Maintenance and Troubleshooting Manual April 2022 00809 0100 3812 130 Emerson com Rosemount ...