9.2.6 Installation instructions
During installation, ensure that the control cables, signal cables (0-10 V,
4-20 mA, 24 V DC, etc.), and the field bus system's (EtherNet/IP) connection
cables are not routed directly parallel to energy-carrying mains connection
cables or motor connection cables. With parallel cable routing, the clearances
between control, signal and field bus cables
②
and energy-carrying mains
and motor cables
①
must be greater than 30 cm.
Cables should always intersect at right angles.
Figure 115:
Cable routing for EtherNet/IP
②
and mains/motor cables
①
If the system requires a parallel routing in cable ducts, a partition must be
installed between the field bus cable
②
and the mains and motor cable
①
,
in order to prevent electromagnetic interference on the field bus.
Figure 116:
Separate routing in the cable duct
a
Mains and motor connection cable
b
EtherNet/IP cable
→
Never lay the cable of a field bus system directly parallel to the
energy carrying cables.
→
In all cases only use approved EtherNet/IP cables.
≧
300 mm
(≧ 11.81“)
②
①
a
b
a
b
Содержание Rapid Link 5
Страница 1: ...Manual Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN ...
Страница 4: ...II ...
Страница 38: ...1 Rapid Link 5 system 1 10 Service and warranty 34 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 118: ...3 Installation 3 7 Isolation test 114 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 196: ...8 Parameter list 8 4 Parameter groups for RASP5 192 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 246: ...10 Error Messages 10 2 Error Messages 242 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...