
2 Engineering
2.3 Repair switches
Rapid Link 5 · RAMO5 · RASP5
05/20 MN034004EN
www.eaton.com
41
2.3 Repair switches
The device versions RAMO5-…-…RS1 and RASP5-…-…R…S1 are equipped
with arepair switch that disconnects the Rapid Link 5 modules from the
mains voltage in all three phases
①
.
Figure 13:
Repair switch in position 0 = OFF
→
Before operating the repair switch, the motor must have stop-
ped.
DANGER
Before performing maintenance or repair work on RASP5 units,
make sure to wait until the DC-Link voltage discharging time
(at least five minutes) has passed.
This also applies when handling the motor.
ATTENTION
For RASP5 units, the pause between two power-on operations
must be at least one minute.
1
2
3
L1
L2
L3
PE
5
4
N
a
e
Содержание Rapid Link 5
Страница 1: ...Manual Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN ...
Страница 4: ...II ...
Страница 38: ...1 Rapid Link 5 system 1 10 Service and warranty 34 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 118: ...3 Installation 3 7 Isolation test 114 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 196: ...8 Parameter list 8 4 Parameter groups for RASP5 192 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 246: ...10 Error Messages 10 2 Error Messages 242 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...