1 Rapid Link 5 system
1.8 Maintenance and inspection
32
Rapid Link 5 · RAMO5 · RASP5
05/20 MN034004EN
www.eaton.com
1.8 Maintenance and inspection
If the general rated operational data (
Table 2, page 19) is observed and
the special technical data is taken into account
(
c technical data, page 124 andPage 138) for the res-
pective power classes and versions, RAMO5 and RASP5 are maintenance-
free. External factors can, however, influence the components’s lifespan and
function. We therefore recommend that regular checks and the following
general maintenance measures be performed at the specified intervals.
Table 7:
Maintenance measures and maintenance intervals
RAMO5 or RASP5 units have not been designed to allow individual assem-
blies of a device to be replaced or repaired.
Maintenance measures
Maintenance interval
Clean cooling vents (cooling slits) - RASP5 only
please enquire
Check the fan function - RASP5 only
6 - 24 months (depending on the environment)
Check plug-in connectors (AS-Interface, sensors, mains,
motor, etc.) and all metallic surfaces for corrosion
6 - 24 months (depending on the environment)
STO function (RASP5 with STO input only)
Activate and deactivate STO at least once every three
months.
Содержание Rapid Link 5
Страница 1: ...Manual Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN ...
Страница 4: ...II ...
Страница 38: ...1 Rapid Link 5 system 1 10 Service and warranty 34 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 118: ...3 Installation 3 7 Isolation test 114 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 196: ...8 Parameter list 8 4 Parameter groups for RASP5 192 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...
Страница 246: ...10 Error Messages 10 2 Error Messages 242 Rapid Link 5 RAMO5 RASP5 05 20 MN034004EN www eaton com ...