Analog Board (GR-PCB2110A)
Service Manual
4-27
4.20
Analog Board (GR-PCB2110A)
Figure 4-22.
Analog Board (GR-PCB2110A)
To replace the analog board, refer to
and perform the following steps:
1.
Remove the regulator and solenoid assembly by performing the procedure in section
and Solenoid Assembly (GR-BKT2105A)
.”
1
Flat cable (GR-CBL2118A)
6
Screw and washer (one of four securing the
board)
2
Blue tube (XD103)
7
Orange tube (XD107)
3
Yellow tube (XD102)
8
Green tube (XD106)
4
Clear tube (XD105)
9
Oxygen sensor cable (GR-CBL2109A)
5
Flow sensor cables
Содержание Newport e360
Страница 1: ...Service Manual Newport e360 Ventilator with Accessories TM...
Страница 7: ...v C Diagrams Index...
Страница 8: ...Page Left Intentionally Blank vi...
Страница 12: ...Page Left Intentionally Blank viii...
Страница 24: ...Introduction Page Left Intentionally Blank 1 12 Service Manual...
Страница 56: ...Maintenance Overhaul and Software Upgrade Page Left Intentionally Blank 2 32 Service Manual...
Страница 112: ...Calibration Procedures Page Left Intentionally Blank 5 16 Service Manual...
Страница 146: ...Ordering and Contact Information Page Left Intentionally Blank B 6 Service Manual...
Страница 148: ...Diagrams C 2 Service Manual Figure C 1 Newport e360 Ventilator Electrical Block Diagram...
Страница 149: ...Service Manual C 3 Figure C 2 Newport e360 Ventilator Pneumatic Diagram SPD2100A...
Страница 150: ...Diagrams Page Left Intentionally Blank C 4 Service Manual...
Страница 152: ...Page Left Intentionally Blank 1 2...
Страница 153: ......