General Troubleshooting Procedures
68
l
Troubleshooting BTS using Resistors Table
l
Pre-power testing
Troubleshooting the power cable (black)
This issue must be determined rapidly as you must verify that the BTS is being powered up correctly.
Sometimes, multiple things can go wrong including the cables. Therefore, it is recommended to prepare
all the cables before the installation.
For details on preparing the power cables, refer to the
cnWave™ 5G Fixed Planning and Installation
Guide.
Note
When preparing the power cable connectors, fit the gland nut, seal, and cage over the wire.
It is important to do this task before fitting the plug body.
It is good practice to test the resistance in the BTS (as described in the
Power cable connections
section)
and keep doing it at each section of the cable, as shown in
Figure 51
.
Power cable connections
A typical installation includes a mains power supply, DC-lightning protection units (LPUs) and the radio
(as illustrated in
Figure 52
).
Note
In
Figure 52
, data cables are not shown. This document is not a substitute for the LPU
Installation Guide. Significant installation and grounding details are omitted for clarity in this
document.
Содержание cnWave 5G Fixed
Страница 1: ...OPERATION AND TROUBLESHOOTING GUIDE cnWave 5G Fixed System Release 3 0...
Страница 64: ......
Страница 75: ...General Troubleshooting Procedures 75 Figure 57 BTS Data cable troubleshooting Part 2...
Страница 78: ...General Troubleshooting Procedures 78 Figure 59 BTS Data cable Resistance checking...