INNOVATION Total 1 Rev 8 06/2013
www.cafection.com
(800) 561-6162
10
INSTALLATION AND SERVICE MANUAL FOR INNOVATION
Total 1
Bean-Cup Brewer
3.3
Levelling the Equipment
For optimal performance of the equipment, it is important to ensure that it is leveled. Avoiding to do so
can create variations in product delivery.
1. Place a level on the top of the equipment;
2. Adjust the 4 threaded level glides or legs of the equipment to reach a leveled position.
3.4
Hot Water Tank Preparation
Make sure equipment is unplugged!
3.4.1 Tank Lid Preparation
1. You can acces the water tank by removing the water tank access door
or the back panel;
2.
Locate the water tank and remove the twist tie securing the float of the
water tank;
3. Remove the silicone tubing from the heating element;
4. Connect the white wire to the prong on the heating element;
5. Replace the access panel.
Initial Setup
Heater safety
switch
Water safety switch
(float)
Heating element
wire
Heater safety switch
Left side view
Water safety switch
(float)
Right side view
Water tank access door
(under the plastic top)