INNOVATION Total 1 Rev. 8 06/2013
INSTALLATION AND SERVICE MANUAL FOR INNOVATION
Total 1
Bean-Cup Brewer
59
www.cafection.com
(800) 561-6162
Preventive Maintenance
6.4
Hot Water Tank
PM: every 60,000 Cycles, quarterly inspection
To avoid any problems related with mineral deposits
over time, we recommend having the water tank
assembly delimed to remove all scale in the unit. Upon
visual inspection, you may wish to replace the element,
probe and the water level and heater safety switch.
Use a scale remover product. Such as Scale Kleen by
Everpure. See the manufacturer instructions for more
details.
Heater Switch
Water level switch
Element
Probe