
INNOVATION Total 1 Rev 8 06/2013
www.cafection.com
(800) 561-6162
12
INSTALLATION AND SERVICE MANUAL FOR INNOVATION
Total 1
Bean-Cup Brewer
Initial Setup
3.5.2 Lock the cover of the grinder
protector
Close the cover of the grinder protector
and lock using the latch.
Grinder protector cover
3.5
3 Bean Canister Installation
3.5.1 Install the 3 Bean Canister
Unpack the 3 bean canister.
Open the cover of the grinder protector.
Install the canister on the shelf by aligning
the 3 transmissions of the canister with the
3 motors already fixed on the shelf and the
2 pins on the other side of the shelf. Push
backward to fix in place.
Grinder protector cover
Transmission
Motor
Pin of the shelf
Latch