
INNOVATION Total 1 Rev 8 06/2013
www.cafection.com
(800) 561-6162
2
INSTALLATION AND SERVICE MANUAL FOR INNOVATION
Total 1
Bean-Cup Brewer
Table of Contents
1 SAFETY INSTRUCTIONS...............................................................................................................5
1.1 Food-Contact Parts .......................................................................................................5
1.2 Warnings ........................................................................................................................5
1.3 Power supply .................................................................................................................5
1.4 Disconnect the equipment if: .......................................................................................5
2 WARRANTY ....................................................................................................................................6
2.1 Warranty Policy .............................................................................................................6
2.2 Warranty Return Procedure .........................................................................................7
2.3 Shipping Liabilities .......................................................................................................7
3 INITIAL SETUP ...............................................................................................................................8
3.1 On-site installation requirements ................................................................................8
3.1.1 Operating environment ................................................................................8
3.1.2 Power Supply ...............................................................................................8
3.1.3 Water Supply ................................................................................................8
3.1.4 Tools Required .............................................................................................8
3.1.5 Clearances ....................................................................................................8
3.2 Unpacking ......................................................................................................................9
3.3 Levelling the Equipment.............................................................................................10
3.4 Hot Water Tank Preparation .......................................................................................10
3.4.1 Tank Lid Preparation ..................................................................................10
3.4.2 Adjusting the Tank Overflow Float
...........................................................11
3.5 3 Bean Canister Installation .......................................................................................12
3.5.1 Install the 3 Bean Canister ........................................................................12
3.5.2 Lock the cover of the grinder protector ..................................................12
3.6 Water Line Connection ...............................................................................................13
3.7 Electrical Connection .................................................................................................14
3.8 Water Temperature ......................................................................................................15
3.9
Drip Tray and Overflow Installation
...........................................................................16
3.9.1 Overflow tray Installation
..........................................................................16
3.9.2 Drip Tray Installation ..................................................................................17
3.10 Loading Products........................................................................................................18
3.11 Chute System Installation ..........................................................................................19
3.12 Brewer and whipping system ....................................................................................20
3.13 Filter Paper Installation ..............................................................................................22
3.14 Removing printer (Optional) ......................................................................................23
3.14.1 Replacing printer paper .............................................................................23
3.14.2 Description of printer’s button .................................................................23
3.14.3 Ordering printer paper ...............................................................................23
3.15 Testing Installation ......................................................................................................24
3.16 About coins and bill acceptors ..................................................................................24
3.17 Main Board...................................................................................................................25
3.17.1 Main Board (PCB) Description ..................................................................26
3.18 Removing
flash card
..................................................................................................28
3.18.1 Accessing flash card installed inside the brewer
..................................28
3.18.2 Accesing the computer installed inside the fascia ................................29
3.18.3 Removing the flash card
...........................................................................30
3.18.4 Inserting the flash card
.............................................................................30
Table of Contents