INNOVATION Total 1 Rev. 8 06/2013
INSTALLATION AND SERVICE MANUAL FOR INNOVATION
Total 1
Bean-Cup Brewer
19
www.cafection.com
(800) 561-6162
Initial Setup
3.11 Chute System Installation
1. Open the door of the equipment;
2. Insert the chute base inside the chute hole of the cabinet;
3. Insert the large waste chute into the chute base;
4. Install the front panel by aligning the metal bracket behind the front panel with the metal
bracket fixed on the brewer assembly.
Internal waste bin maximum coffee capacity: 80 cups
Metal bracket
of the front panel
Metal bracket of the
brewer assembly
Front panel
Waste chute
Chute base