6 Operation
K-375 / K-376 / K-377
Operation Manual, Version E
86
(screenshot stretched)
Press
NEW
to create a new sample sequence.
After entering a unique name for the new sequence
either a first single step, or a default set of the five
commonly used steps can be added to the new
sequence (press
Add Defaults
to add the default
set of steps or select a single step from the list and
press
OK
).
Additional steps can be entered by pressing
NEW
.
NOTE
Since the order of the steps can not be changed
afterwards, make sure to add the steps in a reason-
able order.
To change the order of steps within a sequence
you have to delete selected steps and to add them
again in a reasonable order.
NOTE
Except the steps “Rack 4“, “Rack 12“, and “Rack
20“ none of the steps can be changed from within
the sequence. (See the table at the beginning of
this chapter for details.)
The tasks Preheating, Priming, and Cleaning are
always performed “via sampler”, if used within a
sequence. Even if those tasks are set to “unit only”
within the “System Preparation” under “Preparative
tasks”, this setting will be omitted.