Chapter 5. Maintenance and Service
5.1 Transducer maintenance and
inspection
WARNING!
All equipment should be de-energized prior
to servicing!
PanaFlow™ LC shows low signal strength upon couplant dry
out or extrude.
Refer Couplant in “Transducer Installation” on page 15, Step
2 and “Transducer Installation” on page 15 for servicing
couplant for proper operation of PanaFlow LC.
69
Содержание Panametrics PanaFlow LC
Страница 1: ...PanaFlow LC User s manual 910 327 Rev A...
Страница 2: ...ii...
Страница 3: ...PanaFlow LC Panametrics liquid ultrasonic flowmeter User s manual 910 327 Rev A Sep 2019 iii...
Страница 4: ...no content intended for this page iv...
Страница 12: ...no content intended for this page xii...
Страница 44: ...Figure 58 Setting up pulse output 32...
Страница 49: ...Figure 60 Setting up alarm output 37...
Страница 80: ...no content intended for this page 68...
Страница 82: ...no content intended for this page 70...
Страница 86: ...no content intended for this page 74...
Страница 98: ...Table 30 Service Record Date Description of Service Performed By 86...
Страница 104: ...no content intended for this page 92...
Страница 106: ...no content intended for this page 94...
Страница 114: ...no content intended for this page 102...
Страница 138: ...no content intended for this page 126...
Страница 140: ...no content intended for this page 128...
Страница 145: ...no content intended for this page 133...