
Installing IP500/IP500 V2
Page 44
15-601042 Issue 28c (19 August 2013)
IP Office 9.0
1.10.5 Grounding
All IP Office control units and external expansion modules must be connected to a functional ground. Where the unit is
connected to a power outlet using a power cord with an earth lead, the power outlet must be connected to a protective
earth.
Use of ground connections reduces the likelihood of problems in most telephony and data systems. This is especially
important in buildings where multiple items of equipment are interconnected using long cable runs, for example phone and
data networks.
In some cases, such as ground start trunks, in addition to being a protective measure, this is a functional requirement for
the equipment to operate. In other cases it may be a locale regulatory requirement and or a necessary protective step, for
example areas of high lightning risk.
·
WARNING
During installation do not assume that ground points are correctly connected to ground. Test ground points before
relying on them to ground connected equipment.
The ground point on IP Office control units and external expansion modules are marked with a
or
symbol. Ground
connections to these points should use a 14 AWG solid wire with either a green sleeve for a functional ground or green and
yellow sleeve for a protective ground.
·
Additional protective equipment
In addition to grounding, additional protective equipment will be required in the following situations. Refer to "
Out
of Building Telephone Installations
".
·
On any Digital Station or Phones external expansion module connected to an extension located in another
building.
·
In the Republic of South Africa, on all Analog Trunk external expansion modules (ATM16) and on any control
units containing an analog trunk cards (ATM4/ATM4U).
45
Содержание IP500
Страница 1: ...15 601042 Issue 28c 19 August 2013 Installing IP500 IP500 V2 IP Office 9 0 ...
Страница 10: ......
Страница 11: ...Installing IP500 IP500 V2 Page 11 15 601042 Issue 28c 19 August 2013 IP Office 9 0 System Overview Chapter 1 ...
Страница 12: ......
Страница 58: ......
Страница 117: ...Installing IP500 IP500 V2 Page 117 15 601042 Issue 28c 19 August 2013 IP Office 9 0 On Boarding Chapter 6 ...
Страница 120: ......
Страница 121: ...Installing IP500 IP500 V2 Page 121 15 601042 Issue 28c 19 August 2013 IP Office 9 0 SD Card Management Chapter 7 ...
Страница 132: ...Installing IP500 IP500 V2 Page 132 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...
Страница 138: ...Installing IP500 IP500 V2 Page 138 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...
Страница 143: ...Installing IP500 IP500 V2 Page 143 15 601042 Issue 28c 19 August 2013 IP Office 9 0 Additional Processes Chapter 8 ...
Страница 187: ...Installing IP500 IP500 V2 Page 187 15 601042 Issue 28c 19 August 2013 IP Office 9 0 IP500 Basic Installation Chapter 9 ...
Страница 209: ...Installing IP500 IP500 V2 Page 209 15 601042 Issue 28c 19 August 2013 IP Office 9 0 System Components Chapter 10 ...
Страница 422: ......
Страница 423: ...Installing IP500 IP500 V2 Page 423 15 601042 Issue 28c 19 August 2013 IP Office 9 0 Safety Statements Chapter 11 ...
Страница 434: ......
Страница 440: ......
Страница 441: ...Installing IP500 IP500 V2 Page 441 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...