
Chapter 3 Connecting with DUT
3-2
3.1 Measuring Bit Error Rate
When the DUT input/output signal is electrical:
1. Connect the DUT input terminal to PPG2
Data
Out and Data Out
connectors using the coaxial cable.
If the DUT has only one input connector, connect it to the Data
Output connector of PPG2. Also, connect the coaxial terminator,
which is attached to the BERTWave standard configuration, to the
Data
Out connector.
2. Connect the DUT output terminator to ED2
Data
In and Data In
connectors using the coaxial cable.
If the DUT has only one output connector, connect it to the Data In
connector of ED2. Also, connect the coaxial terminator, which is
attached to the BERTWave standard configuration, to the
Data
In
connector.
PPG2
ED2
DUT
Figure 3.1-1 Making Connections Using Electrical Signal
Содержание BERTWave MP2100B
Страница 24: ...xxiv...
Страница 96: ...Chapter 2 Before Use 2 42...
Страница 112: ...Chapter 3 Connecting with DUT 3 16...
Страница 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Страница 262: ...Chapter 7 Measuring Waveform 7 76...
Страница 276: ...Chapter 8 Operating Optical Interface 8 14...
Страница 304: ...Chapter 9 Performance Test 9 28...
Страница 313: ...10 4 Displaying Software Version 10 9 10 Maintenance 4 Touch Exit and then the software version display screen is closed...
Страница 320: ...Chapter 10 Maintenance 10 16...
Страница 374: ...Appendix E Performance Test Record Form E 10...
Страница 382: ...Index Index 6...