
Chapter 9 Performance Test
9-12
ED2 can be tested in the same way with the Option 012. The connection
diagram is as follows.
PPG1 Data Out
Ch A In
Coaxial Terminator
Coaxial Terminator
Fixed Attenuator
PPG1 Data Out
ED2 Data In Coaxial
Terminator
Coaxial Terminator
Fixed Attenuator
(b) Input Level Measurement
(a) Amplitude Check
Figure 9.2.2-3 ED2 Data In Input Sensitivity Test Connection Diagram
PPG1 Data Out
Ch A In
Coaxial Terminator
Fixed Attenuator
Coaxial Terminator
PPG1 Data Out
ED2 Data In
Coaxial Terminator
Fixed Attenuator
Coaxial Terminator
(b) Input Level Measurement
(a) Amplitude Check
Figure 9.2.2-4 ED2
Data
In Input Sensitivity Test Connection Diagram
Содержание BERTWave MP2100B
Страница 24: ...xxiv...
Страница 96: ...Chapter 2 Before Use 2 42...
Страница 112: ...Chapter 3 Connecting with DUT 3 16...
Страница 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Страница 262: ...Chapter 7 Measuring Waveform 7 76...
Страница 276: ...Chapter 8 Operating Optical Interface 8 14...
Страница 304: ...Chapter 9 Performance Test 9 28...
Страница 313: ...10 4 Displaying Software Version 10 9 10 Maintenance 4 Touch Exit and then the software version display screen is closed...
Страница 320: ...Chapter 10 Maintenance 10 16...
Страница 374: ...Appendix E Performance Test Record Form E 10...
Страница 382: ...Index Index 6...