2-2
129367-410
Routine Maintenance
Installation Verification
❑
All
disconnects
must be provided with lockout capability.
❑
120 VAC, one phase service to the unit must be as specified on the
Equipment Drawing.
❑
120 VAC, one phase service requires a clearly marked
disconnect
located
near the sterilizer
❑
120 VAC, one phase service should be on a separate circuit, and not tied
into circuits containing large reactive loads (e.g., motors).
❑
Three phase power for optional electric steam generators must meet
specifications on the Equipment Drawing.
❑
Three phase service requires a clearly marked
disconnect
located near the
sterilizer.
2.2.3 Electrical Service
❑
Door runs up and down smoothly.
❑
Door open/close time is 7.0-9.0 seconds (power door units).
❑
Door up switches adjusted correctly.
❑
Chamber strainer in place.
❑
Rack and shelves/loading car operates correctly.
❑
Paper loaded in printer.
❑
Unit powers up correctly.
❑
If prevacuum sterilizer, run leak test cycle — leak rate is to be less than
1.0 mmHg/minute.
❑
Verify operation of a typical cycle (e.g., Gravity).
2.2.4 Sterilizer Final
Check
2.2.5 Cycle Operation
WARNING - EXPLOSION
HAZARD: This sterilizer is
not designed to process
flammable compounds.
CAUTION - POSSIBLE
EQUIPMENT DAMAGE:
Sterilization of chloride-
containing solutions (e.g.,
saline) can cause cham-
ber corrosion and is not
recommended by the
manufacturer. If, however,
chloride-containing solu-
tions must be processed,
clean the chamber after
each use.