SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
197
Figure 118. Securing the Power Cord for the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply to an Anchor
4. Connect the power cord to an appropriate AC power source to power
on the power supply.
5. If the chassis has two AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supplies, repeat this procedure to power on the second
power supply.
After powering on the AC system power supplies, do one of the follow:
If the chassis has AT-SBxPWRPOE1 PoE Power Supplies,
perform the procedure in “Powering On AT-SBxPWRPOE1 Power
Supplies” on page 198.
Otherwise, go to “Monitoring the Initialization Process” on
page 227.
Anchor
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...