SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
129
6. Lower the power supply locking handle to secure the power supply to
the chassis, as shown in Figure 56.
Figure 56. Lowering the Handle on the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply
Note
If the module does not fully seat in the chassis slot, check to be sure
you are installing a system power supply and not a PoE power
supply. The model name of the module is included on a label on the
locking handle. For more information, refer to “Power Supplies and
Power Supply Slots” on page 26.
7. To install a second system power supply, repeat this procedure.
8. After installing the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supples, do one of the following:
If you purchased the AT-SBxPWRPOE1 Power Supply for the
ports on the AT-SBx81GP24 PoE Line Cards, go to “Installing AT-
SBxPWRPOE1 PoE Power Supplies” on page 131.
Otherwise, go to Chapter 7, “Installing the AT-SBx81CFC960
Controller and Ethernet Line Cards” on page 143.
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...