Chapter 3: AT-SBx81CFC960 Controller Fabric Card
80
Section I: Hardware Overview
SYS Status LEDs
The SYS (System) Status LEDs on the controller fabric card display
general status information about the controller card, power supplies, and
fan module. The LEDs are defined in Table 24.
Table 24. SYS (System) Status LEDs
LED
State
Description
CFC
Solid Green
Indicates that the AT-SBx81CFC960 Controller
Fabric Card is operating normally as the active
master controller card.
Flashing
Green
Indicates that the controller card is initializing its
management software or synchronizing its
database with the active master controller card.
Solid
Amber
Indicates that the controller card is operating
normally as the standby master controller card.
Flashing
Amber
Indicates that the controller card is disabled. An
active master controller card might disable a
standby master controller card if the two cards
have incompatible versions of the management
software and are unable to resolve the problem,
possibly because of insufficient free flash memory.
PSU
Solid Green
Indicates that the power supplies are operating
properly.
Flashing
Amber
Indicates that a power supply is experiencing a
problem. Possible causes are:
The input AC voltage from a power source is
not within the normal operating range of a
power supply module.
The output DC voltage from a power supply
module to the line cards is not within the
normal operating range.
A power supply is experiencing high
temperature.
A power supply has failed.
Check the status LEDs on the individual power
supply modules to determine which module has a
fault condition.
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...