SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section III: Building a Stack with VCStack Plus
337
Verifying the Stack
After resetting or powering on the devices and waiting four minutes for the
switches to complete initializing the management software and form the
stack, you should verify the stack. To verify the stack, perform the
following procedure:
1. Start a local or remote management session on the stack. You may
use the RS-232 Console port on any controller card in the stack to
establish a local management session. You do not have to use the RS-
232 Console port on the active master controller card.
Note
If you prefer to use the RS-232 Console port on the active master
controller card for the management session, you can determine the
active card by examining the CFC LEDs. The LEDs are green on the
active master controller card and amber on the standby master
controller cards.
2. Enter the ENABLE command to move from the User Exec mode to the
Privileged Exec mode:
awplus> enable
awplus#
3. In the Privileged Exec mode, enter the SHOW STACK command.
awplus# show stack
Figure 201 is an example of the command for a stack that has four
controller cards.
Figure 201. SHOW STACK Command
The stack is operating properly if the command lists all of the controller
cards in both switches of the stack. For instance, the command should
list four controller cards if there are two controller cards in each
chassis, or two controllers if each switch has only one controller card.
Virtual Chassis Stacking summary information
ID
Pending ID
MAC address
Priority
Status
Role
1.5
-
eccd.6d9e.331c
128
Ready
Active CFC
1.6
-
eccd.6d9e.3308
128
Ready
Backup Member
2.5
-
eccd.6d9e.3328
128
Ready
Backup Member
2.6
-
eccd.6d9e.3302
128
Ready
Backup Member
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...